搜索结果: 1-2 共查到“石油与天然气工程 introduction”相关记录2条 . 查询时间(0.032 秒)
Introduction and application of first Synthetic Base Mud in JAPEX field
Synthetic base mud
2009/4/14
In 1987, in order to achieve an efficient 6,000m well drilling, the first introduction of OBM to the domestic field in JAPEX was considered, but temporarily suspended due to Japanese rules and regul...
Introduction of drag reducing agent and leak detection system
BTC Pipeline DRA drag reducing agent drag reduction
2009/4/7
The BTC crude oil pipeline runs 1,768 km from the Sangachal Terminal near Baku in Azerbaijan, via Tbilisi in Georgia, through to the Ceyhan Marine Terminal on Turkish Mediterranean coast. The pipeli...